Malarkey roofing products should only be installed over decks that can sufficiently support the weight of the roofing system and transient load during application of the roofing system.
Malarkey roofing installation instructions.
Malarkey recommends removing the existing roof covering for best performance and appearance.
Underlayment malarkey makes two types of underlayment the first being water resistant mechanically attachedfield underlayments right start udl and our secure start.
1 malarkey laminate shingle installation instructions.
3 malarkey 3 tab shingle installation instructions succeeding courses are full width the first course completely overlapping the starter and followed by courses half lapped over preceding courses on up the roof.
Be sure to overlap the eave drip edge too.
Begin at a lower corner of roof and roll out 2 3 feet of material 610 914 mm.
When re covering an existing shingle roof evaluation of the.
Allow arctic seal and malarkey right start udl to relax prior to installation.
Install malarkey laminate shingles according to build ing code and local for the rake drip edge start at the corner near the eave and work your way up lapping subsequent lengths of flashing over the lower pieces by a minimum of 2 51 mm.
1 malarkey laminate shingle installation instructions.
3 malarkey omniseal system installation instructions application in elevated temperatures.
To apply the rake drip edge start at the corner near the eave and work your way up lapping subsequent lengths of flashing over the lower pieces by a minimum of 2 51 mm.
Install drip edge first along the eaves and later on the rakes once the field underlayment has been applied.
Malarkey arctic seal is self adhering but this attribute is affected by cold weather and moisture often making it necessary to fasten the underlayment in place until shingles can be applied.
Be sure to overlap the eave drip edge too.
Nailing pattern use four 4 fasteners for each starter shin gle.
Install with fasteners placed 1 3 38 76 mm up from the eave one fastener 1 25 mm from each end of the starter and the remaining two 2 evenly spaced on the same line as the end fasteners.
Do not place fasteners in the seal down strip.
Failure to use properly condi tioned deck materials can result in deck movement which can damage the roof covering and may void your warranty.
System such as leaks and buckling increase if installed directly over wood board decks.
Kneeling or standing in front of the roll score the release film all the way across with a straight blade knife taking care not to cut the membrane itself.
Residential building code section r905 2 8 5 drip edge flashing drip edge eave or rake metal is required along the eave and rake edges of shingle roofs.